top of page

NOW HIRING

T B LANDMARK IS THE LEADER IN UNDERGROUND UTILITY CONSTRUCTION, SPECIALIZING IN:

- HORIZONTAL DIRECTIONAL DRILLING

 

- NATURAL GAS TRANSMISSION & DISTRIBUTION

- WATER & SEWER INFRASTRUCTURE

- ENGINEERING & DESIGN/BUILD

 

- WATER RECLAIM

 

LEADERS IN UNDERGROUND UTILITY CONSTRUCTION

About T B Landmark Construction, Inc.

T B Landmark Construction, Inc. is committed to revolutionizing the utility construction industry with sustainable practices and innovative solutions. Our dedication to eco-friendly materials and efficient processes sets us apart, ensuring that every project is not only functionally superior but also environmentally responsible.

IMG_0508.HEIC

Our Services

Horizontal Directional Drilling

T B Landmark currently owns and operates 25 HDD rigs in various pull-back capacities up to a million pounds ; including over 200 pieces of support equipment. We have performed drill shots in excess of 4,800 linear feet in a single pull, with diameters up to 48 inches.​

Natural Gas Transmission & Distribution

T B Landmark’s experience in the gas construction industry is extremely diversified. We perform sole-source construction maintenance contracts for various gas companies within Florida. These contracts, along with complimenting open-bid awards and word of mouth referrals, have made us a leader in our markets.​

Water & Sewer Infrastructure

Since 1999 we have constructed hundreds of miles of mains and services, for municipalities and the private sector throughout Florida, Georgia and South Carolina; in diameters up to 42″. 

Engineering & Design /Build

Through strategic alliances, we can partner with you to:

  • Write specifications

  • Calculate bend radii & feasibility

  • Reduce costs

  • Reduce intrusion & restoration of the environment

  • Provide turn-key construction services

Water Reclaim

We provide efficient solutions for capturing, treating, and reusing water on underground utility projects. We help reduce waste, save resources, and meet environmental goals without slowing down progress.

Join Our Team

T B Landmark is growing, and we’re looking for driven individuals to join our team. We have immediate openings for Project Managers, Drillers, Mechanics, and CDL Drivers. If you're ready to be part of a trusted company in underground utility construction with a strong commitment to quality, safety, and teamwork — apply today and build your future with us.

TB Landmark - 3,200' HDD 24" Reclaim
02:31
TB LANDMARK - OFFICIAL COMMERCIAL
01:06
TB Landmark - 1500' 36" Pullback
02:08
T B Landmark - St Augustine Project
01:47
TB LANDMARK - PANAMA CITY 42" WATER MAIN LINE
01:50
TB LANDMARK - SIDE BY SIDE RIGS
02:58
TB LANDMARK - LAND O' LAKES WATER MAIN LINE PROJECT
01:48
T B Landmark - DeLand Project
02:01
TB LANDMARK - NOW HIRING PROJECT MANAGERS
00:58

Gas Projects

Indian River HP Connector Ph I & II

Installation of 81,700’ of 6” Steel Natural Gas Line. 

Brevard RNG 12” MDPE Natural Gas Pipeline

Installation of 25,908’ of 12” MDPE Pipe gas main by open cut and HDD. This project also included a gate station. 

PPC Sebastian RD Relocate

Installation of 6,124’ of 6” Steel Natural Gas by HDD.

Nopetro Interconnect

Installation of 3100’ of 2” PE, 2800’ of 6” steel, 1300’ of 8” steel gas main and 500’ of 2” conduit and the construction of a duel run RNG station coming from the landfill. 

Wildlight Phase 2  (B)

Installation of 4,295’ of 8” Steel Natural Gas by HDD & Open Cut. 

KSC Roberts Rd 4 Inch Steel Natural Gas Main Extension

Installation of 3,500' of 4" steel gas main, regulator station and meter station.

Water / Sewer Projects

Lift Station 72 Bypass Force Main 

Construction of 1240’ of 24” PVC, 6000’ of 20” PVC, 11000’ of 16” PVC, 20’ of 12” PVC, 20’ of 8” PVC, 20’ of 6” PVC all installed by open cut method.  5200’ of 24” HDPE, 6000’ of 20” HDPE, 1700’ of 16” HDPE all installed by HDD.  42” steel casing Jack and Bore and a 36” Steel casing Jack and Bore.  All associated Valves, ARV, and fittings.

SR 207 HDD

Fusion and installation of 7 drills 1,500’ and 900’ of 30” HDPE Reclaimed Water Main and (2) 1,500’ of 30” HDPE Force Main, and 500’, 750’ and 816’ of 20” force main by HDD. 5 drills remaining to be completed. 

East Palatka Septic to Sewer- Phase IV

Construction of individual residential grinder pump stations, small diameter sanitary force main piping and master pump station and force main piping, as well as directional bores under roadways and driveways along US 17 (SR 15) connecting to the existing 6-inch sanitary force main at the southwest corner of US 17 (SR 15) and Horse Landing Road.

Saratoga Springs Offsite Utilities

Installation of 120’ of 6”, 60’ of 10”, 7,180’ of 12” ad 3,440’ of 16” DR 18 PVC Water main by open cut, 300’ of 16” and 700’ of 20” HDPE DR 11 WM by HDD. 40’ of 10”, 7,080’ of 12”, and 3,440’ of 16” DR 18 PVC Reclaimed Water Main by open cut, 150’ of 16” and 700’ of 20” HDPE DR 11 RWM by HDD. 2,280’ of 6”, 1,200’ of 10”, 3,680’ of 12”, 7,400’ of 16” and 2,520’ of 18” DR 18 PVC Force Main by open cut. 300’ of 8”, 100’ of 12”, 900’ of 20” and 900’ of 24” HDPE DR-11 FM by HDD. 

Construction for DB RWM SR 16

Water Reclamation Facility to I-95

Design and Installation 13,980’ of 24” HDPE RWM by HDD in 12 drills, 80’ of 6” HDPE RWM and 420’ of 8” HDPE RWM by HDD. 9,340’ of 20”, 20’ of 16”, 120’ of 12”, 60’ of 10”, 180’ of 8” and 220’ of 6” PVC RWM by open cut. 

East Side Regional Force Main (Part A)

Installation of 82’of 4” C900 PVC, 75’ of 10” C900 PVC, 100’ of 12” C900 PVC, 25’ of 16” C900 PVC, 12’ of 18” C900 PVC, 201’ of 20” C900 PVC and 353’ of 24” C900 PVC Force Main by open cut. Project also included 1,200’ of 4” HDPE DR 11, 2,500’ of 10” HDPE DR 11, 1,600’ of 20” HDPE DR 11 and 6,400’ of 24” HDPE DR 11 force Main by HDD. 

Water Infrastructure

King Street Bridge -San Sebastian River WM Replacement

Installation of 805’ of 18” HDPE DR-11 WM by Subaqueous HDD, and 200’ of 8” PVC within the FDOT right of way. Project required extensive MOT planning and execution due to the highly congested FDOT right-of-way in the heart of St. Augustine, FL.

Villages of Westport Offsite FM HDD

Fusion and installation of 7 Drills: 600’, 300’, 350’, 350’, 1,070’, 650’, and 500’ of 24” HDPE FM by HDD

Deer Point Dam Raw Water Line Utility Mitigation Ph II

Installation of 2,115' of 42” IPS HDPE Subaqueous Raw Water Main by horizontal directional drilling under Deer Point Reservoir and 540' of 36" PVC Raw Water Main.

Town of Callahan- Design/ Build- Crawford Diamond Development Water & Sewer Facilities

Design and Installation of 20 LF of 4” PVC FM, 15,251 LF of 8” PVC FM, and 4,260 LF of 12” PVC FM by open cut, 250 LF of 14” HDPE FM via HDD, 10,000 LF of 10” HDPE FM via HDD with the longest drill totaling 1,200 LF in a single pull. 300 LF of 12” PVC WM via open cut. Project also included 200 LF of 24” Steel Casing FM J/B, 200 LF of 24” Steel Casing WM J/B both under CSX Railroad and Building a Wastewater Treatment Plant and a Water Treatment Plant. 

Nocatee South Reclaimed Water Improvements

Installation of 3,000 LF of 20-inch CL 250 ductile iron reclaimed water main by open cut, 1,200 LF of 24-inch DR11 HDPE reclaimed water main by horizontal directional drill, 75 LF of 36-inch and 50 LF of 30-inch steel casing by auger bore.

SR 228 Water & Sewer Main Extension

Installation of 160 LF of 16"PVC water main, 3,940 LF of 12" PVC water main, and 50 LF of 10" PVC force main via conventional installation; 1,140 LF of 24" HDPE casing with 16" FPVC water main carrier pipe, 460 LF of 12" FPVC water main, 1,150 LF of 16" HDPE casing pipe with 10" FPVC force main carrier pipe and, 540 LF of 10" FPVC force main via directional drilling.

Get in Touch

Have a question or want to discuss an underground utility construction project? Feel free to reach out to us.

We're here to help.

(904) 751-1016

Info@tblandmark.com

11220 New Berlin Road

Jacksonville, FL 32226

11220 New Berlin Rd

Jacksonville, FL 32226

bottom of page